

Project:
2nd Berth at GCPL Marine facility
Quantity:
67,856 inch dia pipe fabrication
6,08,579 inch m pipe installation
Owner:
Gujarat Chemical Port Limited
Equipment Type:
Piping Systems
EPC Contractor:
Afcons Infrastructure Ltd.
Year of Completion:
Ongoing
PMC:
Reliance Industries Limited
Services:
Fabrication and installation of pipelines with related valves and fittings
Fabrication, installation, erection and commissioning of:
• Process Pipings
• Valves & Fittings
• Firefighting systems.
Let’s build a future together with
innovative and reliable EPC solutions.


WhatsApp us